A dissertation submitted to the Faculty of Engineering, University
of the Witwatersrand, Johannesburg, in fulfilment of the requirements
for the degree of Master of Science in Engineering.
Johannesburg, 1990. / The static Rand gold price has put pressure on the South African gold mines to improve efficiency. Superior metallurgical performance and lower costs attributed to column flotation prompted the construction of a pilot
plant (238 millimetres by 10 metres) at ERGO, an Anglo American tailings retreatment plant [Abbreviated Abstract. Open document to view full version] / MT2017
Identifer | oai:union.ndltd.org:netd.ac.za/oai:union.ndltd.org:wits/oai:wiredspace.wits.ac.za:10539/22859 |
Date | January 1990 |
Creators | Eves, Jonathan Charles Joshua |
Source Sets | South African National ETD Portal |
Language | English |
Detected Language | English |
Type | Thesis |
Format | Online resource (175 leaves), application/pdf |
Page generated in 0.0025 seconds