Return to search

Information systems infrastructure for manufacturing planning systems.

This dissertation describes the successful implementation of a work group infrastructure to support electronic meetings. An exploratory study was undertaken to observe and document the broad range of activities necessary to implement an infrastructure for work groups in a field setting. Activities falling within the scope of this dissertation include the design of a set of work group software tools, the implementation of that software, the gathering of field data, and the interpretation of those data in reference to the software's impact. The dissertation also reports on the effects of the implementation on work group performance, group characteristics, task characteristics, and the technology itself. The final product of the study is a set of factors critical for the successful implementation of a work group infrastructure, including observations and insights related to facility design, software design, facilitation training, and management involvement.

Identiferoai:union.ndltd.org:arizona.edu/oai:arizona.openrepository.com:10150/184720
Date January 1989
CreatorsMartz, William Benjamin, Jr.
ContributorsNunamaker, Jay F., Vogel, Douglas, Ram, Sudha
PublisherThe University of Arizona.
Source SetsUniversity of Arizona
LanguageEnglish
Detected LanguageEnglish
Typetext, Dissertation-Reproduction (electronic)
RightsCopyright © is held by the author. Digital access to this material is made possible by the University Libraries, University of Arizona. Further transmission, reproduction or presentation (such as public display or performance) of protected items is prohibited except with permission of the author.

Page generated in 0.0022 seconds