This work deals with the issue of supply restoring for heating plant Teplárny Brno, a. s. Špitálka division, after a system-wide failure of the “blackout”. The thesis solves the “black start” of the Špitálka Teplárny Brno operation by delivering a voltage from the hydroelectric power Vír I, proposes a methodology for commissioning of individual devices, up to phasing the generators with subsequent possibility of creating an “island mode” in the area of Brno city, which the work already does not deal with. The work also deals with the preparation of the operational test, while starts of the selected devices are tested. The schedule of commissioning of each device is supported by calculations of the parameters for the entire system with regard to voltage drops while connecting the high load. The result of this work is the proposal of methodological process of supply restoring for power plant Teplárny Brno – Špitálka division, by submission a voltage from the hydroelectric power Vír I, which can be used both in any system-wide failure of the “blackout”, or during the operational test.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:220373 |
Date | January 2015 |
Creators | Jára, Jaroslav |
Contributors | Vaculík, Petr, Orságová, Jaroslava |
Publisher | Vysoké učení technické v Brně. Fakulta elektrotechniky a komunikačních technologií |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0018 seconds