In this thesis, we discussed various possibilities of integrating scheduling decisions with information and constraints from Advanced Process Control (APC) systems in semiconductor Manufacturing. In this context, important questions were opened regarding the benefits of integrating scheduling and APC. An overview on processes, scheduling and Advanced Process Control in semiconductor manufacturing was done, where a description of semiconductor manufacturing processes is given. Two of the proposed problems that result from integrating bith systems were studied and analyzed, they are :Problem of Scheduling with Time Constraints (PTC) and Problem of Scheduling with Equipement health Factor (PEHF). PTC and PEHF have multicriteria objective functions.PTC aims at scheduling job in families on non-identical parallel machines with setup times and time constraints.Non-identical machines mean that not all miachines can (are qualified to) process all types of job families. Time constraints are inspired from APC needs, for which APC control loops must be regularly fed with information from metrology operations (inspection) within a time interval (threshold). The objective is to schedule job families on machines while minimizing the sum of completion times and the losses in machine qualifications.Moreover, PEHF was defined which is an extension of PTC where scheduling takes into account the equipement Health Factors (EHF). EHF is an indicator on the state of a machine. Scheduling is now done by considering a yield resulting from an assignment of a job to a machine and this yield is defined as a function of machine state and job state.
Identifer | oai:union.ndltd.org:CCSD/oai:tel.archives-ouvertes.fr:tel-00847032 |
Date | 29 March 2012 |
Creators | Obeid, Ali |
Publisher | Ecole Nationale Supérieure des Mines de Saint-Etienne |
Source Sets | CCSD theses-EN-ligne, France |
Language | English |
Detected Language | English |
Type | PhD thesis |
Page generated in 0.0019 seconds