Return to search

Zhodnocení napojení JEDU na horkovodní síť města Brna / Case study on utilizing of heat from the nuclear power plant Dukovany in the district heating system

In this thesis, I was solved assessment of nuclear power plant Dukovany, conection to the hot water network to city Brno. For determine the size needful enforcement was necessary to establish the heat balance of needs of the city of Brno and the size of the heat supply options. After that it was possible to determine the dimensions of pipes and optimize his routes of due to the current state of land along the route of thermal power supply. Power supply parameters were chosen with regard to the possibilities of technology used for transmission of the media and the status quo for distribution of the city Brno. After pushing the power supply ahead of the city Brno into the pumping station Bosonohy, and second part of the solution was the connection to the backbone wiring SCZT heat to individual customers. The last point was elaborated design management system of heat from nuclear power plant and urban local based resources on current management of heat supply system using consumption diagrams SCZT.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:229279
Date January 2010
CreatorsKozel, David
ContributorsDrbošal, Jan, Pospíšil, Jiří
PublisherVysoké učení technické v Brně. Fakulta strojního inženýrství
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.002 seconds