Return to search

Parní turbína - tvorba a odvod kondenzátu / Steam turbine - condensation formation and discharge

Master thesis is dealing with the issue of condensate creation and removal from the Nesher Ramle steam turbine during start-up and steady state. At the beginning a preliminary calculation of heat balance and the turbine itself is done. It is followed by description and design of drainage system supplemented by calculation of the steam flow through the orifices. Steam flow calculation was done via S. D. Morris, Pavelek with Kalčík and Ambrož, all three methods were compared. The main goal is the theoretical calculation of the amount of condensate created during start-up which is influenced by its initial state from which it is started. Three default states are considered, cold, warm and hot. In the last chapter the comparison of theoretical calculation with the measured data on real turbine is done and it is supported by the evaluation of the data from the measurement of the steam turbine at steady state on maximum power and half power. From the steady state analysis, percentage of water flow to expander from the total amount of condensate formed in the turbine were obtained.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:400499
Date January 2019
CreatorsZouhar, Adam
ContributorsFilip, Patrik, Fiedler, Jan
PublisherVysoké učení technické v Brně. Fakulta strojního inženýrství
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0017 seconds