Heuristic approaches for crane scheduling in ship building

This study provides heuristic approaches, including an ant colony optimization (ACO) inspired heuristic, to solve a crane scheduling problem that exists in most shipyards, where cranes are a primary means of processing and handling materials. Cranes move on a network of tracks, thus, blocking of crane movements is an issue. The crane scheduling problem consists of two major sub-problems: scheduling problem that determines the best overall order in which jobs are to be performed; the assignment problem that assigns cranes to jobs. The proposed heuristic consists of an Earliest Due Date sorting procedure in combination with an ACO assignment procedure that aims to satisfy the objectives of minimizing makespan while maximizing crane utilization. Test data sets of various sizes are generated and the results of the proposed approach are compared to other developed heuristics. The proposed approach outperforms others in both objective measures and obtains solutions in a timely manner.

Identiferoai:union.ndltd.org:MSSTATE/oai:scholarsjunction.msstate.edu:td-3486
Date09 August 2008
CreatorsWen, Charlie Hsiao Kuang
PublisherScholars Junction
Source SetsMississippi State University
Detected LanguageEnglish
Typetext
Formatapplication/pdf
SourceTheses and Dissertations

Page generated in 0.0017 seconds