Return to search

Most na dálnici nad Dolanským potokem / design of higway bridge accross Dolansky creek

My thesis is focused on a design and comparism of the highway bridge across Dolansky creek. The bridge is built by balanced cantilever method. The common span length is 110metres. The bridge is post-tensioned concrete structure.The static model is made of beams.The static analysis during lifespan of bridge is made by Time discretization analysis . The design of reinforcement is made for longitudinal section and cross section.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:226425
Date January 2013
CreatorsŠedrla, Jakub
ContributorsSliwka, Pavel, Zich, Miloš
PublisherVysoké učení technické v Brně. Fakulta stavební
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0025 seconds