Return to search

Optimalizace provozu indukční pece ve slévárně Vsetín / Optimalization of Induction Furnace Operation in foundry Vsetín

The aim of this work is optimalisation of induction furnace in foundry for company PROMET FOUNDRY a.s. The company has two induction furnances. There are installed as identical construction. They have 2 modes of operation. First mode is founding and second mode is mode, where is temperature in maintain mode. Only one induction furnance can work in the founding mode at a time though. Inducion furnances are in the single-phase connection and they cause unbalance in the distribution network. Near the foundry there is a small network area whitch it is operated by company Zásobování teplem Vsetín a.s. The consumption of electrical energy in foundry so big, that in the year 2009 was made elaborate for Zásobování teplem Vsetín a.s. It was write at Laboratoře diagnostiky výkonů (Laboratory of performance diagnostics), which is a part of Electrotechnic Department at Technical Univarsity of Ostrava. The ordered study was named “Verification of causes of increased reactive energy consumption during transition from electricity delivery to electricity consumption”. The conclusion of this assignment confirms that in distribution network in the Jiráskova area in Vsetín there is unbalance of electrical energy and there is high part of reactive power. The next conclusion is crucial to find the customer who made the unbalance and to set relevant remedy. The last step will be the identification whether such device can actually be effectively balanced. It was subsequently proved that the Promet Foundry was causing the unbalance and that balanced consumption would be reasonable. Promet Foundry thus addressed Autel a.s. company with an inquiry to make a study of removing the causes of the unbalance which is caused by current induction furnaces operation at a minimum possible cost, least possible influence on the performance and minimum construction changes concerning the building. In this thesis there will be some topics. The result of which will be introducing of used heating technology, introducing of company and of effective plant performance and subsequent suggestions of possible unbalance removal or reactive power decrease. Several ways which are being implemented in the industry in order to balance consumption will be described. A suitable balancing plant will be subsequently chosen and its parameters will be calculated.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:219082
Date January 2011
CreatorsTrachta, Jiří
ContributorsNowak, Stanislav, Lázničková, Ilona
PublisherVysoké učení technické v Brně. Fakulta elektrotechniky a komunikačních technologií
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0022 seconds