Return to search

Förstudie för automatisering av skateboardtillverkning

This report is based on a thesis that was carried out during spring 2012. The report covers the development of a preliminary study to Performance Sk8. The purpose of the study is to facilitate and contribute inspiration to Performance Sk8 to run an automation project to bring home their production to Sweden from China. The reason is to gain a greater ability to control quality, produce smaller batches and reduce the cycle time to reduce costs. The goal is that the preliminary study shall meet the requirements and wishes Performance Sk8 and other partners defined. The pre study will contain different cost proposals for the automation of selected process and serve as a basis for procurement of the equipment. The pre study has resulted in some proposed solutions to the various steps required to automate Performance Sk8 ́s production. In addition to the proposed solutions are also concept proposal which has developed with suggestions for flows, prices and other information that can help Performance Sk8 in its ongoing automation project.

Identiferoai:union.ndltd.org:UPSALLA1/oai:DiVA.org:mdh-16101
Date January 2012
CreatorsCedervall, Andreas, Hök, Andreas
PublisherMälardalens högskola, Akademin för innovation, design och teknik, Mälardalens högskola, Akademin för innovation, design och teknik
Source SetsDiVA Archive at Upsalla University
LanguageSwedish
Detected LanguageEnglish
TypeStudent thesis, info:eu-repo/semantics/bachelorThesis, text
Formatapplication/pdf
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0019 seconds