Return to search

Abordagem sobre a construção, instrumentação e operação das paredes diafragmas do sistema de barragens Gramame / Mamuaba. / Approach concerning the construction, instrumentation and operation of the diaphragm walls of the Gramame / Mamuaba Dam System.

Submitted by Johnny Rodrigues (johnnyrodrigues@ufcg.edu.br) on 2018-11-06T20:01:57Z
No. of bitstreams: 1
JOSÉ LAMARK PEREIRA HENRIQUES - DISSERTAÇÃO PPGECA 1993..pdf: 33749440 bytes, checksum: e11f849d78d25d2e4af28abaa5c1be6d (MD5) / Made available in DSpace on 2018-11-06T20:01:57Z (GMT). No. of bitstreams: 1
JOSÉ LAMARK PEREIRA HENRIQUES - DISSERTAÇÃO PPGECA 1993..pdf: 33749440 bytes, checksum: e11f849d78d25d2e4af28abaa5c1be6d (MD5)
Previous issue date: 1993-02-05 / Este trabalho apresenta um estudo do comportamento do sistema de barragens de terra Gramame / Mamuaba, construído no município de Alhandra, PB, situado a 20 Km ao
sul da capital do Estado da Paraíba, João Pessoa. Ênfase foi dada às pressões da água intersticial na fundação do maciço e as paredes diafragmas inseridas no sistema. 0 estudo teve como objetivo analisar os dados fornecidos pelos instrumentos instalados na obra, limitados pelo período final de construção, primeiro enchimento do reservatório e dois anos iniciais de operação. No capítulo de análise das pressões intersticiais
procurou-se mostrar a evolução das mesmas através de seções transversais das barragens. O comportamento do contato núcleo-fundação durante a evolução do enchimento do reservatório foi mostrado através da piezometria traçada em algumas das barragens. Uma abordagem sobre a construção da parede diafragma, instrumentação utilizada na Engenharia Geotécnica e arranjo geral da obra é apresentada, com a finalidade de fornecer uma visão global do estudo efetuado. / This work presents a study on the behaviour of dams constructed in the municipal district of Alhandra, PB, situated twenty kilometers to the south of the capital of Paraiba State, Joao Pessoa. Emphasis was given to the porous water pressures in the foundation of the compact and of the diaphragm walls inserted in the system. The objectiva of the sudy was to anlyse the data provided by the instruments inserted in the construction, 1 imitated by the last phases of the construction, first filling up of the resevoir and two inicial years of
operat ion. In the chapter of the analysis of the pressures water filtration it was shown the evolution of it by means of the transverse sections to the dam. The behavior of the nucleus foundation contact during the period of the filling of the resevoir was shown by means of drawning in some sections of the dam. A study of the construction of the diaphragm
walls, instruments utilized in the geotecnnical engineering and general arrangement of the work is presented, with the view to providing a global view of tie study.

Identiferoai:union.ndltd.org:IBICT/oai:localhost:riufcg/2138
Date06 November 2018
CreatorsHENRIQUES, José Lamarck Pereira.
ContributorsBARBOSA, Normando Perazzo., LUCENA, Francisco Barbosa de., FERREIRA, Heber Carlos., FERREIRA, Ademilson Montes.
PublisherUniversidade Federal de Campina Grande, PÓS-GRADUAÇÃO EM ENGENHARIA CIVIL E AMBIENTAL, UFCG, Brasil, Centro de Tecnologia e Recursos Naturais - CTRN
Source SetsIBICT Brazilian ETDs
LanguagePortuguese
Detected LanguagePortuguese
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis
Sourcereponame:Biblioteca de Teses e Dissertações da UFCG, instname:Universidade Federal de Campina Grande, instacron:UFCG
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.003 seconds