Return to search

Cost-constrained project scheduling with task durations and costs that may increase over time : demonstrated with the U.S. Army future combat systems /

Thesis (M.S. in Operations Research)--Naval Postgraduate School, June 2004. / Thesis advisor(s): Robert A. Koyak. Includes bibliographical references (p. 59-61). Also available online.

Identiferoai:union.ndltd.org:OCLC/oai:xtcat.oclc.org:OCLCNo/56088664
Date January 2004
CreatorsGrose, Roger.
PublisherMonterey, Calif. : Springfield, Va. : Naval Postgraduate School ; Available from National Technical Information Service,
Source SetsOCLC
LanguageEnglish
Detected LanguageEnglish
Source(7.97 MB)

Page generated in 0.0022 seconds