Return to search

Effektivisering av logistiklösningar : En jämförelse av nya och gamla logistiksystem vid ROT-projekt

A persistent problem in the construction industry is its low margins of profit. It is often difficult to earn money due to low efficiency and high costs. Logistics on the construction site answers for a large amount of these costs and it is therefore of interest to find new, more efficient logistic solutions. The purpose of this thesis is to compare two different logistic systems and further to evaluate which one that is the most efficient and profitable. A comparison is made between the traditional logistic systems used for years and a new logistic system developed by an industry association called BEAst. The survey was conducted in cooperation with Peab Sweden AB on two of their construction sites in Västerås, Sweden. Findings show that the modern logistics system is more effective than the traditional, but that the traditional currently is more profitable. A more comprehensive establishment of the new system needs to be done in the construction industry in order to reduce the cost of logistics way, and to work out major routine in the workplace in order to minimize errors and create more intelligent solutions. Keywords: Logistics, construction logistics, BEAst, Supply Chain Management, Just In Time, delivery systems Nyckelord: Logistik, Bygglogistik, BEAst, försörjningsprocessen, Just In Time, leveranssystem

Identiferoai:union.ndltd.org:UPSALLA1/oai:DiVA.org:mdh-25282
Date January 2014
CreatorsEsseen Larsson, Alexander
PublisherMälardalens högskola, Akademin för ekonomi, samhälle och teknik
Source SetsDiVA Archive at Upsalla University
LanguageSwedish
Detected LanguageEnglish
TypeStudent thesis, info:eu-repo/semantics/bachelorThesis, text
Formatapplication/pdf
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0021 seconds