There has been full of inefficiency and waste in current operation method of steel structure industries. This study hopes to utilize Toyota Just-in-time Production System for fabrication of steel structure to eliminate current each waste during the production process. The main purpose of this study is take case company as an example to discuss the following respects: 1.The current production process of steel structure industries. 2.The application of Toyota Just-in-time Production System in the steel structure fabrication.
This study first introduces the framework of Toyota Just-in-time Production System to apprehend its spirit and then explains the concept and advantage of Toyota Just-in-time Production System explicitly. Also, this study compares Toyota Just-in-time Production System with current production method of steel structure industries.
Second, according to the glancing of related document reference, this study discusses the application method and its profit for Toyota Just-in-time Production System in the manufacturing industries. As there are significant differences in structure or operation method between steel structure industries and manufacturing industries, thus this study utilizes gradual erection plan to match Toyota Just-in-time Production System during the period of fabrication process plan to eliminate the distinction between these two industries besides explaining the necessary rationalized operation when leading Toyota Just-in-time Production System in.
Having visited the production line and made mutual communication with operation chief, this study has found the current problems existing in production management in case company. According to this discovery, this study uses bridge production line and built-up H section production line as pilot implementation to discuss the possible question and solution policy for Toyota Just-in-time Production System concept applied in steel structure fabrication so as to frame the procedures and criterion of Toyota Just-in-time Production System in fabrication of steel structure and also to evaluate its profit.
Identifer | oai:union.ndltd.org:NSYSU/oai:NSYSU:etd-0521103-183941 |
Date | 21 May 2003 |
Creators | Lee, Chien-Cheng |
Contributors | Tsuang Yih Kuo, Iuan Yuan Lu, Yu Hui Cheng |
Publisher | NSYSU |
Source Sets | NSYSU Electronic Thesis and Dissertation Archive |
Language | Cholon |
Detected Language | English |
Type | text |
Format | application/pdf |
Source | http://etd.lib.nsysu.edu.tw/ETD-db/ETD-search/view_etd?URN=etd-0521103-183941 |
Rights | unrestricted, Copyright information available at source archive |
Page generated in 0.0017 seconds