Return to search

Návrh úprav a konfigurace sítě 22 kV po instalaci transformace 110/22 kV ve spínací stanici Brno-sever / Proposal of design and configuration of 22 kV network after installation of 110/22 kV transformation in Brno-Sever switching substation

The theoretical part of this thesis deals with distribution networks in terms of distribution according to different criteria, describes the main elements of electric distribution networks and their qualities. The following describes the methods of calculating the steady state of electrical networks. These methods are nowadays used as basics for computer programs. In the penultimate chapter of the theoretical part are summarized the principles for the development of present networks and construction of new electrical networks. The aim of practical part of the thesis is to assess the current condition of the network 22 kV in the city of Brno and assess the condition after installation of 110/22 kV transformation in Brno-Sever switching substation. After evaluating the results of steady state electrical network and identifying certain problems is the following aim a proposal of solving problems that emerged in the network. The result should be operational, functional and reliable electric distribution network. This thesis used to calculate the steady state electrical networks by software PAS DAISY Off-Line Bizon V4.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:220170
Date January 2013
CreatorsMišinger, Ondřej
ContributorsBeneš, Jan, Blažek, Vladimír
PublisherVysoké učení technické v Brně. Fakulta elektrotechniky a komunikačních technologií
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0016 seconds