ITC/USA 2013 Conference Proceedings / The Forty-Ninth Annual International Telemetering Conference and Technical Exhibition / October 21-24, 2013 / Bally's Hotel & Convention Center, Las Vegas, NV / The need for increased downlink data rates and bandwidth for Earth Observation (EO) missions is driving mission planners to consider Ka-Band (25.5 to 27.0 GHz) downlinks to replace or augment the existing X-Band (8.025 to 8.400 GHz) services. Future ground stations will be required to support both bands as well as S-Band (2.0-2.3) GHz telemetry and command functions. This paper discusses the inherent tradeoffs in such a design, and proposes an implementation which permits simultaneous data reception in X-Band and Ka-Band, while providing TT&C functionality at S-Band. Analytical and measured data for the implementation are provided.
Identifer | oai:union.ndltd.org:arizona.edu/oai:arizona.openrepository.com:10150/579701 |
Date | 10 1900 |
Creators | Baggett, Brian, Parekh, S., Sinyard, David, Chandler, Brian, Morris, R. |
Contributors | ViaSat Inc. |
Publisher | International Foundation for Telemetering |
Source Sets | University of Arizona |
Language | en_US |
Detected Language | English |
Type | text, Proceedings |
Rights | Copyright © held by the author; distribution rights International Foundation for Telemetering |
Relation | http://www.telemetry.org/ |
Page generated in 0.0018 seconds