This Master's thesis is focused on connecting of new power sources into electrical network, particularly, the steady state and allowed voltage variation in network nodes, which occur in steady state before and after connection of a new power source into distribution network, with regard to valid legislation. The new power source in question is the new wind farm Drahany with active power of 45 MW, which should be connected into distribution network 110kV, operated by distribution company E.ON. The aim of this work is to find the most suitable connection point of a wind farm into distribution network, considering transmission capacity of individual electric lines and voltage variations in network nodes, as well as Drahany wind farm's investor's expenses on construction of a connection line to connection point and the distribution network's operator's expenses on modification of the connection point. Also, methods of calculating of electric networks in steady state are described in this paper, particularly, linear calculations, because these are needed for the calculations in E-vlivy program, in which the possible options of Drahany wind farm's connection into network 110 kV, in various places, were modeled. The description of the E-Vlivy program is also included in this paper. The E.ON company's materials form the basis for this Master's thesis, which will later serve as one of the documents needed for Drahany wind farm’s connection point evaluation into distribution network 110 kV.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:219419 |
Date | January 2012 |
Creators | Gregr, Tomáš |
Contributors | Opat, Jaroslav, Topolánek, David |
Publisher | Vysoké učení technické v Brně. Fakulta elektrotechniky a komunikačních technologií |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0018 seconds