This master's thesis deals with the area hospital distribution networkand one of the hospital's entry substation. The first part of this master's thesis deals with the project of the new cable network, her gradual revival without any power outages at the collection points. Futher, in this thesis is project of temporary transformer station for supplying power during the reconstruction of the HV switchboard. Subsequently, in this thesis is project of the new HV switchboard in one of the entry substation. new HV switchgear and a new HV substation were projected. Futher, in this thesis is proposed compensation of the whole area, including the HV network.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:377072 |
Date | January 2018 |
Creators | Komárek, Filip |
Contributors | Procházka, Aleš, Orságová, Jaroslava |
Publisher | Vysoké učení technické v Brně. Fakulta elektrotechniky a komunikačních technologií |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0018 seconds