When soluting the contruction of a grab dredger we will deal with suitable solution with reference to its using and capacity, possibilites of its setting in low temperatures and incidental aplication of the exchangeable abrasion - resistant mouldings. There will be made a calculation of forces taking effect on a grab dredger and a check calculation of the chosen structural parts.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:228815 |
Date | January 2009 |
Creators | Kubánek, Jan |
Contributors | Smutek, Josef, Škopán, Miroslav |
Publisher | Vysoké učení technické v Brně. Fakulta strojního inženýrství |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0017 seconds