The objective of this thesis is to verify the "base test method" for uplift loading of C- and Z-purlin supported, standing seam metal building roof systems. To achieve this end, eight sets of full-scale roof system tests were conducted. Each test set consisted of a single span base test and a three-span, multi-purlin line, confirming test. The base test method for uplift loading, in its present form, did not prove to be an effective method for determining the failure load of a multispan, multi-purlin line, standing seam roof system. Suggestions are made for possible modifications to the method. / Master of Science
Identifer | oai:union.ndltd.org:VTETD/oai:vtechworks.lib.vt.edu:10919/44264 |
Date | 18 August 2009 |
Creators | Anderson, Bennett B. |
Contributors | Civil Engineering, Murray, Thomas M., Easterling, William Samuel, Garst, Donald A. |
Publisher | Virginia Tech |
Source Sets | Virginia Tech Theses and Dissertation |
Language | English |
Detected Language | English |
Type | Thesis, Text |
Format | viii, 187 leaves, BTD, application/pdf, application/pdf |
Rights | In Copyright, http://rightsstatements.org/vocab/InC/1.0/ |
Relation | OCLC# 23745962, LD5655.V855_1991.A644.pdf |
Page generated in 0.002 seconds