The master thesis describes a complete design of an office building, including its technical equipment. The building's technical equipment contains HVAC, lighting, DHW and photovoltaics design, water demand. The building has two floors. It contains offices, a bistro with a lounge, a wellness area and two gyms, a children's playground and facilities. This master thesis is divided into three parts. Firstly, the thesis presents building documentation with an engineering and an accompanying report. Secondly, the thesis introduces the design of the building's technical equipment and engineering reports. Lastly, the results of a conducted experiment are presented. In this experiment, a system for the optimization of blind tilt angle is proposed.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:432765 |
Creators | Kotas, Marek |
Contributors | Počinková, Marcela, Blasinski, Petr |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0023 seconds