In this thesis two important aspects affecting economical use of cableways in forestry are examined. First part of the thesis deals with comparison between existing performance standards for cableways and values obtained from field research during yarding the timber. The research took place in French Masiv Central from September to December 2014 using cablway based on the conception of skyline and endless line. Research shows that the time consumption of timber skidding quoted in the performance standards is overvalued compared to data obtained from the field research. Second part of the thesis is focused on economic aspects of the cableway operation. The whole issue is illustrated on model example analysing year costs and yields resulting from cableway operation. Output of this work is also a file of MS Excel programme which calculates year costs and yields on the basis of entered parameters (cableway price, labour costs, number of the months of cableway operation...). From these values the return on investment to cableway is then calculated.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:257864 |
Date | January 2015 |
Creators | Hvězda, Mikuláš |
Contributors | Natov, Pavel, Dvořák, Jiří |
Publisher | Česká zemědělská univerzita v Praze |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0482 seconds