In the master thesis are explained terms related to public contract. The greatest attention is devoted the various types of qualification assumptions. The main objective is to compare qualification requirements of public works contracts in the field of water management structures. The analysis was performed on four specific public contracts, with an analysis of the differences between them were found. Public contract, open procedure, simplified sub-limit management, qualification, qualification requirements, the sponsor, the expected value, the law on public contracts.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:227067 |
Date | January 2014 |
Creators | Hartman, Jan |
Contributors | Dufek,, Zdeněk, Korytárová, Jana |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0078 seconds