This thesis deals with the current state of assembly workplace for prefabrication in selected company. Using lean manufacturing principles it describes and subsequently eliminating all forms of waste that occur in the workplace. Part of the project is to design a new layout of the manufacturing cell, operation balancing and standardize the work of operators in the process. The project aims to achieve the planned production volumes at the same or lower operating costs.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:241939 |
Date | January 2016 |
Creators | Škrdla, Michal |
Contributors | Bernát, Michal, Strejček, Jan |
Publisher | Vysoké učení technické v Brně. Fakulta strojního inženýrství |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0017 seconds