Return to search

Increasing the capacity of a flow shop : technical and organizational issues

Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering; and, (S.M.)--Massachusetts Institute of Technology, Sloan School of Management; in conjunction with the Leaders for Manufacturing Program at MIT, 2001. / Includes bibliographical references (p. 70). / by Gavin J DeNyse. / S.M.

Identiferoai:union.ndltd.org:MIT/oai:dspace.mit.edu:1721.1/88956
Date January 2001
CreatorsDeNyse, Gavin J. (Gavin James), 1971-
ContributorsStanley Gershwin and Janice Klein., Leaders for Manufacturing Program., Leaders for Manufacturing Program at MIT, Massachusetts Institute of Technology. Department of Mechanical Engineering, Sloan School of Management
PublisherMassachusetts Institute of Technology
Source SetsM.I.T. Theses and Dissertation
LanguageEnglish
Detected LanguageEnglish
TypeThesis
Format96 p., application/pdf
RightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission., http://dspace.mit.edu/handle/1721.1/7582

Page generated in 0.0017 seconds