Return to search

Lean implementation across value stream in main rotor blade area

Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering; in conjunction with the Leaders for Manufacturing Program at MIT, 2007. / Includes bibliographical references (p. 61). / The primary goal for this project was to help expand the existing capability of Sikorsky's main rotor blade business from raw material (titanium) through final assembly. The project helped to facilitate the ongoing lean transformation as the factory makes the journey to single-piece flow. During the internship, monthly kaizen events were used to help focus efforts on different areas of the value stream. These activities resulted in changes in the following areas: decrease in cycle times and lead times, reduction in inventory, procedural changes, and a future plan to physically change the factory floor to improve flow. / by Casey J. Phoenix. / S.M. / M.B.A.

Identiferoai:union.ndltd.org:MIT/oai:dspace.mit.edu:1721.1/39692
Date January 2007
CreatorsPhoenix, Casey J. (Casey John)
ContributorsJan Klein and Daniel Whitney., Leaders for Manufacturing Program., Leaders for Manufacturing Program at MIT, Massachusetts Institute of Technology. Department of Civil and Environmental Engineering, Sloan School of Management
PublisherMassachusetts Institute of Technology
Source SetsM.I.T. Theses and Dissertation
LanguageEnglish
Detected LanguageEnglish
TypeThesis
Format61 p., application/pdf
RightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission., http://dspace.mit.edu/handle/1721.1/7582

Page generated in 0.2258 seconds