Return to search

Measuring losses of learning due to breaks in production.

Approved for public release; distribution is unlimited / The analysis of a break in production is usually performed by a government negotiator or cost analyst. The more effectively they are able to estimate the loss of learning due to breaks in production, the more likely that the final contract will be fair and reasonable. The research of this study focused on identifying the factors which contribute to a loss of learning due to a break in production and the methods which are available to quantify these factors. The four methods identified were the George Anderlohr, the DCAA, the Pinchon and Richardson, and the Cubic Curve. These methods were then analyzed using the data from two aircraft, the Grumman C-2A and the Bell Helicopter Textron AH-1W, both of which experienced breaks in production. This study concludes that the George Anderlohr approach is the most effective method to evaluate the loss of learning due to a break in production. / http://archive.org/details/measuringlosseso00ever / Captain, United States Marine Corps

Identiferoai:union.ndltd.org:nps.edu/oai:calhoun.nps.edu:10945/23300
Date12 1900
CreatorsEverest, Jeffrey David.
ContributorsHart, E.N., Lamm, David V., Naval Postgraduate School (U.S.), Administrative Sciences
PublisherMonterey, California. Naval Postgraduate School
Source SetsNaval Postgraduate School
Languageen_US
Detected LanguageEnglish
TypeThesis
Format87 p., application/pdf
RightsThis publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.

Page generated in 0.002 seconds