This thesis deals with the analysis of data obtained by observing and measuring workplaces of assembly lines with a focus on the efficiency of their utilization, through selected elements of industrial engineering, which the reader can get acquainted with in the theoretical part of the thesis. In this thesis the line productivity during the shifts is analyzed, an ideal line balancing condition is defined and suggestion for changing the time of line consumption norm according to the measured line cycle time is made. According to the complex analyzes of the workplaces, suggestions are concluded and an economic appreciation of these proposals is also elaborated. The author of this thesis finds the main benefit of this work in increasing of the productivity of the analyzed line in the case of implementation of solution designs.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:318338 |
Date | January 2017 |
Creators | Milota, Tomáš |
Contributors | Tesař, Rostislav, Jurová, Marie |
Publisher | Vysoké učení technické v Brně. Fakulta podnikatelská |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0023 seconds