The purpose of this project was to map the current method for decommissioning / disposing of the Nano-wire reactor at Sol Voltaics. Additionally, alternatives should be suggested based on the findings during the mapping processes and the subsequent analysis. The aim of the presented alternatives was to improve the current workflow for reactor decommissioning based on five identified areas; Rules and Regulations; Environmental aspects; Safety aspects; Economical aspects and Logistical aspects. The existing disposal procedure was divided into six steps. The first step involves a purging procedure to make sure no hazardous gases remain in the reactor. The second step is to dismantle and seal the reactor. The third step is to move the reactor to a loading dock. The fourth step is the transport between Active Biotech in Lund and Sydblästring AB in Malmö. The fifth step is the disassembly and cleaning process of the reactor parts, including waste management. The sixth and final step is to move the cleaned parts to SYSAV in Malmö for final disposal. Finally, Rules and Regulations as well as Safety aspects were identified as having partial improvement potential. Ideas for possible alternatives in these areas was devised and analyzed according to all five areas to make sure that the improvements in one area would not bring undesirable shortcomings in another.
Identifer | oai:union.ndltd.org:UPSALLA1/oai:DiVA.org:liu-125478 |
Date | January 2016 |
Creators | Nilsson, Jens, Nilsson, Johan |
Publisher | Linköpings universitet, Kommunikations- och transportsystem, Linköpings universitet, Tekniska högskolan, Linköpings universitet, Kommunikations- och transportsystem, Linköpings universitet, Tekniska högskolan |
Source Sets | DiVA Archive at Upsalla University |
Language | English |
Detected Language | English |
Type | Student thesis, info:eu-repo/semantics/bachelorThesis, text |
Format | application/pdf |
Rights | info:eu-repo/semantics/openAccess |
Page generated in 0.0021 seconds