As part of the Federal Highway Administration's Long-Term Bridge Performance Program, Live Load and Dynamic tests were conducted. A long-term monitoring plan was developed and presented for the Utah Pilot Bridge based on Live Load and Dynamic tests. As one of seven pilot bridges, the Utah Pilot Bridge is one of the first bridges used to initiate the LTBP Program. A formal permit approval process, with the Utah Department of Transportation, was followed to gain permission to conduct the tests and install long-term instrumentation. Analysis provided good results for each test completed, with a summary of test results presented. A Finite Element Model was created and refined based off test data. Instrumentation was installed and checked to ensure quality data was streaming to the collection site.
Identifer | oai:union.ndltd.org:UTAHS/oai:digitalcommons.usu.edu:etd-1719 |
Date | 01 May 2010 |
Creators | Petroff, Steven M. |
Publisher | DigitalCommons@USU |
Source Sets | Utah State University |
Detected Language | English |
Type | text |
Format | application/pdf |
Source | All Graduate Theses and Dissertations |
Rights | Copyright for this work is held by the author. Transmission or reproduction of materials protected by copyright beyond that allowed by fair use requires the written permission of the copyright owners. Works not in the public domain cannot be commercially exploited without permission of the copyright owner. Responsibility for any use rests exclusively with the user. For more information contact Andrew Wesolek (andrew.wesolek@usu.edu). |
Page generated in 0.0011 seconds