As the point of integrated time and cost, the research is to study the project management by way of EVMS(Earned Value Management System). With case study the research explore the feasibility and value of EVMS applied project management
The research explores the integration between time and cost by way of project-managerial technique. The purposes are as follows:
l To explore the techniques of project management.
2 To study the theory, function and target about EVMS.
3 With case study, to compare the difference between traditional project management and EVMS.
4 Elementarily to evaluate to introduce EVMS into government project management.
To fulfill previous purposes, the research design is adopted case study and paper investigation. The findings are as below:
l EVMS has a better explanatory ability to the difference analysis of project management.
2 If time and cost control system adopt the same measurement unit, it can avoid confusion of information expression.
3 One of core information is to accurately measure the progress of the project.
4 EVMS has a good ability to forecast EAC(Estimate At Completion).It signals an early warning.
5 EVMS is suitable for government project management. The level of integration depends upon how to adjust the accounting system.
Identifer | oai:union.ndltd.org:NSYSU/oai:NSYSU:etd-0627100-164137 |
Date | 27 June 2000 |
Creators | Han, Gow-Shiang |
Contributors | Junying Huang, Tsai-Yuan Lin, Pei-How Huang |
Publisher | NSYSU |
Source Sets | NSYSU Electronic Thesis and Dissertation Archive |
Language | Cholon |
Detected Language | English |
Type | text |
Format | application/pdf |
Source | http://etd.lib.nsysu.edu.tw/ETD-db/ETD-search/view_etd?URN=etd-0627100-164137 |
Rights | unrestricted, Copyright information available at source archive |
Page generated in 0.0019 seconds