Reliability is one of the most critical performance measures of guided missile systems. It is directly related to missile mission success. In order to have a high reliability value, reliability analysis should be carried out at all phases of the system design. Carrying out reliability analysis at all the phases of system design helps the designer to make reliability related design decisions in time and update the system design.
In this study, reliability analysis process performed during the conceptual design phase of a Medium Range Anti-Tank Missile System Inertial Measurement Unit (IMU) was introduced. From the reliability requirement desired for the system, an expected IMU reliability value was derived by using reliability allocation methods. Then, reliability prediction for the IMU was calculated by using Relex Software. After that, allocated and predicted reliability values of the IMU were compared. It was seen that the predicted reliability value of the IMU did not meet the required reliability value. Therefore, reliability improvement analysis was carried out.
Identifer | oai:union.ndltd.org:METU/oai:etd.lib.metu.edu.tr:http://etd.lib.metu.edu.tr/upload/12612387/index.pdf |
Date | 01 September 2010 |
Creators | Unlusoy, Ozlem |
Contributors | Alemdaroglu, Nafiz |
Publisher | METU |
Source Sets | Middle East Technical Univ. |
Language | English |
Detected Language | English |
Type | M.S. Thesis |
Format | text/pdf |
Rights | To liberate the content for METU campus |
Page generated in 0.0058 seconds