Submitted by Maicon Juliano Schmidt (maicons) on 2015-04-23T19:33:59Z
No. of bitstreams: 1
Ariel Peixoto Possebon.pdf: 3073454 bytes, checksum: 3123d6ee99ea9509d9a3ef1e02464701 (MD5) / Made available in DSpace on 2015-04-23T19:33:59Z (GMT). No. of bitstreams: 1
Ariel Peixoto Possebon.pdf: 3073454 bytes, checksum: 3123d6ee99ea9509d9a3ef1e02464701 (MD5)
Previous issue date: 2013-01-31 / Nenhuma / O Planejamento, Programação e Controle da Produção e dos Materiais é um importante processo do fluxo de informação que visa o desdobramento do Planejamento Estratégico para os níveis operacionais da empresa. Tais atividades, planejamento e programação, são atividades analíticas que envolvem a tomada de decisões que impactam na operação dos sistemas de produção. Para tomar estas decisões de forma correta, estes processos precisam da robustez necessária para auxiliar tais decisões. Na contrapartida, os sistemas de produção são diferentes aumentando ou diminuindo sua complexidade e consequentemente a forma como a empresa toma suas decisões. Neste contexto, este estudo pretende evidenciar quais são as diferenças existentes sob o prisma do PPCPM para dois tipos de sistemas de produção, os sistemas que atendem à demanda baseado em uma produção Make-To-Order (MTO), e os sistemas baseado em uma produção Make-To-Stock (MTS). Para tanto, a pesquisa foi realizada utilizando um Estudo de Caso múltiplo, considerando o PPCPM como sua unidade de análise. A partir desta análise, obteve-se como resultados desta pesquisa, as principais diferenças entre os processos de PPCPM para estes dois tipos de sistemas de produção com base nos casos estudados. / The Production Planning and Production Scheduling processes are important flow of information aimed at the deployment of the Strategic Planning for the operational levels of the company. Such activities, planning and scheduling, are analytical activities that involve making decisions that affect the operation of production systems. To make these decisions so correct, these processes require robustness needed to support these decisions. In contrast, the different production systems are increasing or decreasing its complexity and consequently how the company makes its decisions. In this context, this study aims to highlight what are the differences through the prism of PPCPM for two types of production systems, systems that meet the demand based on a production Make-To-Order (MTO), and systems based on a production Make-To-Stock (MTS). Therefore, the survey was conducted using a multiple case study, considering the PPCPM as unit of analysis. From this analysis, it was obtained as result of this research, the main differences between the PPCPM processes for these two types of production systems based on case studies.
Identifer | oai:union.ndltd.org:IBICT/oai:www.repositorio.jesuita.org.br:UNISINOS/3343 |
Date | 30 August 2013 |
Creators | Possebon, Ariel Peixoto |
Contributors | http://lattes.cnpq.br/2828871234344046, Antunes Júnior, José Antônio Valle |
Publisher | Universidade do Vale do Rio dos Sinos, Programa de Pós-Graduação em Engenharia de Produção e Sistemas, Unisinos, Brasil, Escola Politécnica |
Source Sets | IBICT Brazilian ETDs |
Language | Portuguese |
Detected Language | Portuguese |
Type | info:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis |
Source | reponame:Repositório Institucional da UNISINOS, instname:Universidade do Vale do Rio dos Sinos, instacron:UNISINOS |
Rights | info:eu-repo/semantics/openAccess |
Page generated in 0.002 seconds