Master´s thesis processes Construction technology project and implementation of bridge at Soběslav on the route D3, section D3 Tábor – Veselí nad Lužnicí, concretely SO 7-216 Bridge over the route III/15527, Černovický stream and biocorridor km 94,100. This is a permanent road bridge about 25 fields with the continuous construction of precast prestressed concrete beams longitudinally coupled concrete slab.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:227312 |
Date | January 2015 |
Creators | Topinka, Jiří |
Contributors | Špinar, Petr, Hrazdil, Václav |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0015 seconds