Return to search

Applying risk management to reduce the time in lay-up while increasing the cost effectiveness of a Nimitz (CVN 68) class aircraft carrier in dry dock during the execution phase of a refueling and complex overhaul

Thesis (M.S. in Systems Engineering)--Naval Postgraduate School, March 2009. / Thesis Advisor(s): Langford, Gary O. "March 2009." Description based on title screen as viewed on April 23, 2009. Author(s) subject terms: Systems Engineering Process, Risk Management, Risk Analysis, Risk Matrix, Cost Effectiveness, Time Effectiveness, Refueling and Complex Overhaul. Includes bibliographical references (p. 111-114). Also available in print.

Identiferoai:union.ndltd.org:OCLC/oai:xtcat.oclc.org:OCLCNo/319438154
Date January 2009
CreatorsRahming, Kiah Bernard.
PublisherMonterey, Calif. : Naval Postgraduate School,
Source SetsOCLC
LanguageEnglish
Detected LanguageEnglish
Source(2,059 KB)

Page generated in 0.0015 seconds