Tirad, a metal machining company, plans to build a new hall as an extension of its operation. This paper deals predominantly with production flow analysis of present operation. The analysis draws upon literary study and the company's previous production experience. Possible placement of machines is suggested in the following part of the paper, based on the analysis and requirements of the company. The fundamental requirement is to separate roughing and finishing technological operations, moving the latter completely into the new hall. The deployment of machines is optimized with regard for materiál flow. The new hall's dimensions are outlined in a drawing. Three options of machine deployment are discussed. In conclusion, these options are compared to one another and also to the present state.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:230562 |
Date | January 2013 |
Creators | Dohnal, Tomáš |
Contributors | Navrátil, Petr, Kubík, Roman |
Publisher | Vysoké učení technické v Brně. Fakulta strojního inženýrství |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0019 seconds