Return to search

Manutenção planejada para a redução de falhas e defeitos que ocorrem em equipamentos de uma empresa do setor de energia elétrica

Submitted by Cleide Dantas (cleidedantas@ufpa.br) on 2014-11-12T13:52:15Z
No. of bitstreams: 2
license_rdf: 22974 bytes, checksum: 99c771d9f0b9c46790009b9874d49253 (MD5)
Dissertacao_ManutencaoPlanejadaReducao.pdf: 4879881 bytes, checksum: f01efb76fdf4a19f369a85221064ed47 (MD5) / Approved for entry into archive by Ana Rosa Silva (arosa@ufpa.br) on 2014-11-12T16:14:07Z (GMT) No. of bitstreams: 2
license_rdf: 22974 bytes, checksum: 99c771d9f0b9c46790009b9874d49253 (MD5)
Dissertacao_ManutencaoPlanejadaReducao.pdf: 4879881 bytes, checksum: f01efb76fdf4a19f369a85221064ed47 (MD5) / Made available in DSpace on 2014-11-12T16:14:07Z (GMT). No. of bitstreams: 2
license_rdf: 22974 bytes, checksum: 99c771d9f0b9c46790009b9874d49253 (MD5)
Dissertacao_ManutencaoPlanejadaReducao.pdf: 4879881 bytes, checksum: f01efb76fdf4a19f369a85221064ed47 (MD5)
Previous issue date: 2013 / A preocupação com as rotinas de manutenção normalmente está relacionada à falha de um processo ou equipamento (manutenção corretiva). O controle sistemático da manutenção e
operação dos ativos é considerado um alto ponto de redução de custos e aumento da
disponibilidade operacional para o planejamento estratégico. Como resultado, tem-se na área de manutenção, uma grande quantidade de métodos,
software, modelos e ferramentas de gestão disponíveis. Dentre eles, dois métodos se
destacam: o RCM (Reliability Centered Maintenance ou Manutenção Centrada em
Confiabilidade), de origem norte-americana, e o TPM (Total Productive Maintenance ou
Manutenção Produtiva Total), de origem japonesa. Desta forma, o objetivo principal deste trabalho é estudar a sistemática do
planejamento estratégico e da manutenção planejada para a redução de falhas e defeitos que
ocorrem em equipamentos, a partir das metodologias propostas pelos principais autores da
área de planejamento estratégico e manutenção, com o intuito de propor melhorias na
utilização desta ferramenta. Com base no referencial teórico (Amendola, Berndt, Coimbra,
Certo, Copser, Nakajima, Mendes, Moreira, Moubray, Oliveira, Kaplan entre outros)
estudado, foi possível iniciar a compreensão do planejamento da gestão da manutenção
planejada da Usina Hidrelétrica de Tucuruí e suas práticas de desempenho em relação às
práticas de referência e dos principais indicadores estratégicos destacados por esses autores.
Esta pesquisa possibilitou avaliar que o atual procedimento adotado em Tucuruí está alinhado
com todos os pensadores estudados, bastando apenas à melhor disseminação de todos os
conceitos entre todos os níveis hieraquicos de planejamento e execução. / The concern with routine maintenance is usually related to a failure of process or equipment
(corrective maintenance). The systematic control of maintenance and operation of machinery
and equipment is considered a high point for reducing costs and increasing operational
readiness for strategic planning. As a result, it has been in service area, a large number of methods, software models and
management tools available. Among them, two methods stand out: the RCM (Reliability
Centered Maintenance and Reliability Centered Maintenance) of U.S. origin, and TPM (Total
Productive Maintenance and Total Productive Maintenance), of Japanese origin. Thus, the main objective of this work is the systematic study of strategic planning and
planned maintenance to reduce failures and defects that occur in equipment from the proposed
methodologies by leading authors in the area of strategic planning and maintenance, in order
to propose improvements in the use of this tool. Based on the theoretical (Amendola, Berndt,
Coimbra, Right, Coser, Nakajima, Mendes Moreira, Moubray, Oliveira, Kaplan and others)
studied, could begin to understand the planning of the management of planned maintenance of
the Tucuruí Hydroelectric Plant and their practices in relation to the performance practices of
reference and key strategic indicators highlighted by these authors. This research allowed to
evaluate the current procedure adopted at Tucuruí is aligned with all the thinkers studied by
simply spreading the best of all concepts hieraquics between all levels of planning and
execution.

Identiferoai:union.ndltd.org:IBICT/oai:repositorio.ufpa.br:2011/6037
Date04 July 2013
CreatorsSILVA, Fábio do Nascimento
ContributorsNEVES, Renato Martins das
PublisherUniversidade Federal do Pará, Programa de Pós-Graduação em Engenharia Civil, UFPA, Brasil, Instituto de Tecnologia
Source SetsIBICT Brazilian ETDs
LanguagePortuguese
Detected LanguagePortuguese
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis
Sourcereponame:Repositório Institucional da UFPA, instname:Universidade Federal do Pará, instacron:UFPA
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0021 seconds