Return to search

Stochastic optimization of stope design and long-term underground mining production scheduling for sublevel open stoping mining operations

No description available.
Identiferoai:union.ndltd.org:mcgill.ca/oai:escholarship.mcgill.ca:v405sg81w
Date January 2022
CreatorsFurtado E Faria, Matheus
ContributorsRoussos G Dimitrakopoulos (Supervisor)
PublisherMcGill University
Source SetsMcGill University
Languagehttp://id.loc.gov/vocabulary/iso639-2/eng
Detected LanguageEnglish
TypeThesis
RightsAll items in eScholarship@McGill are protected by copyright with all rights reserved unless otherwise indicated.

Page generated in 0.0019 seconds