One of the products produced by Motorpal a.s. is a camshaft. Recently, the company signed a contract with Bosch company to produce new types of camshaft. The analysis of the impact of the contract on the production was made by simulation. To perform the simulation it was necessary to map the whole process. The simulation of the current state was made in the first phase. The results shew many uneffectivnesses in the process and lack of capacity of some workplaces. Some changes in the process were suggested and tested with the aid of the simulation. The best results were achieved when the single-item flow was used. In the second phase the production of a new type of camshaft was added to the simulation. Analysis of these results was divided into two parts. The new production was analysed in the first part and it was discovered that the planned capacites are very deficient. The impact of the new production on the current one was analysed in the second part. It shew that this impact is negativ, especially on the duration of production.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:17313 |
Date | January 2009 |
Creators | Medonos, Michal |
Contributors | Dlouhý, Martin, Kuncová, Martina |
Publisher | Vysoká škola ekonomická v Praze |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.002 seconds