Return to search

Construction and development of a nuclear magnetic resonance detection system

The major work involved is the debugging procedure on the Varian Model V-21003 electromagnet, power supply and spectrometer and the design and construction of supporting structure to house the various pieces of apparatus which were required to complete the system.Equipment which was not immediately available was then designed and constructed, with the final step being the testing. of the entire system for its integrity.Adjustments to each component was then carried out to obtain the best signal possible, noting the various changes caused by the condition and setting of each section of the system.

Identiferoai:union.ndltd.org:BSU/oai:cardinalscholar.bsu.edu:handle/181988
Date03 June 2011
CreatorsGoodwin, Charles D.
ContributorsKoltenbagh, David E.
Source SetsBall State University
Detected LanguageEnglish
Formatix, 141 leaves : ill. ; 28 cm.
SourceVirtual Press

Page generated in 0.0023 seconds