The theme of the bachelor thesis is a new building of an administrative building with a storage hall, which will primarily serve for storage in the village of Troubsko. This work is aimed at elaborating project documentation for construction work. The building is non-basement with three above-ground floors. The construction is designed from the Porotherm system with prefabricated ceilings made of prestressed Spiroll panels. The storage hall will be made of a steel skeleton, single-skinned with sandwich panels. The roof is on the top of 2.NP flat single-layer with top layer on parts of concrete pavement on rectifiable targets and vegetation parts. Above the 3rd floor there is a flat single-layer roof with a top vegetation layer and above the storage hall there will be a flat roof with a classical layout of layers with a top layer of PVC foil. The object is functionally divided into 2 parts. The administrative part is primarily used as a base for employees of the production hall in the 1st floor, in the 2nd floor and 3rd floor there are offices. The storage hall will then serve mainly for storage purposes and dispatch preparation.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:372278 |
Date | January 2018 |
Creators | Vít, Marek |
Contributors | Pobořil, Lukáš, Petříček, Tomáš |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0022 seconds