Submitted in partial fulfillment of the requirements for the Degree of Masters of Technology: Mechanical Engineering, Technikon Natal, 1998. / The two and a half billion dollars spent in cleaning up the Exxon Valdez spill in Prince William Sound is one of many indications of how seriously environmental damage is viewed today. Due to the massive problems encountered during spills, clean-ups remain time consuming and costly. Thus the aim of this study is to develop a more efficient method, which will be the design and development of an oil reclaimer to operate in moderate sea conditions. The feasibility of the concept will be evaluated against existing methods. / M
Identifer | oai:union.ndltd.org:netd.ac.za/oai:union.ndltd.org:dut/oai:ir.dut.ac.za:10321/2778 |
Date | January 1999 |
Creators | Candy, Robert Leonard |
Contributors | Walker, M. |
Source Sets | South African National ETD Portal |
Language | English |
Detected Language | English |
Type | Thesis |
Format | 244 p |
Page generated in 0.0022 seconds