Return to search

Otimização do itinerario de sondas de intervenção / Workover rig itinerary otimization

Orientadores: Sergio Nascimento Bordalo, Denis Jose Schiozer / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Mecanica / Made available in DSpace on 2018-07-24T03:21:33Z (GMT). No. of bitstreams: 1
Paiva_RonaldoOliveirade_M.pdf: 5372317 bytes, checksum: 87a623d365c62b997b5436706619b759 (MD5)
Previous issue date: 1997 / Resumo: Os custos envolvidos em intervenções de sonda e a perda de receita nos poços aguardando intervenções são elevados. Este trabalho propõe métodos para analisar profundamente a priorização dos poços em que a sonda deverá intervir. Para determinar a seqüência de intervenção nos poços, é necessário comparar o gasto de sonda com as perdas dos poços. Para calcular as perdas dos poços, é necessário analisar a influência monetária do fechamento dos poços nas curvas de produção dos reservatórios. Neste trabalho, esta análise é feita utilizando-se um simulador numérico de reservatórios. São apresentadas, também, simplificações possíveis para um cálculo expedito. A priorização dos poços é baseada na redução do custo total do caminho, que se constitui da soma das perdas devidas à espera da intervenção, somadas aos custos das sondas. Para determinar o itinerário ideal das sondas, existem muitos algoritmos. Neste trabalho, são implementados e comparados alguns algoritmos considerados intuitivos e de simples implementação. Recomenda-se o algoritmo da Têmpera Simulada para priorizar os poços. Este algoritmo foi implementado para rotear sondas terrestres em uma região petrolífera brasileira. Otimizando as seqüências de intervenção realizadas no ano de 1996, nesta região, identificou-se uma economia potencial de 15%nas perdas de produção, equivalente a 4.000 metros cúbicos/anode petróleo (25.000 bbl/ano) / Abstract: The costs of workover and the loss of revenue in wells waiting workover rigs are very high. This work proposes methods to prioritize these wells in order to minimize the total cost. To determine the workover sequence it is necessary to compare the rig expense with the wells'losses. To ca1culatethe wells' losses, it is necessary to analyze the monetary influence of the well shutdown in the production curves. In this work, this analysis is made by using a numerical reservo ir simulator. Simplified ca1culation procedures are also presented. The priority of the wells is based on the reduction of the total cost, which consists of the rig costs plus the revenue losses due to workover waiting. There are many algorithms able to determine the ideal rig path. In this work, simple and intuitive algorithms, are implemented and ,)mpared. The Simulated Annealing algorithm is recommended. This algorithm was implemented to optimize workover rig routes in a brazilian production region. Otimization of the workover sequence carried out in that region in 1996 identified a potential economy of 15% in the production losses, equivalent to 4.000 'm POT. 3¿/year ofoil (25.000 bbl/year) / Mestrado / Mestre em Engenharia de Petróleo

Identiferoai:union.ndltd.org:IBICT/oai:repositorio.unicamp.br:REPOSIP/264416
Date30 November 1997
CreatorsPaiva, Ronaldo Oliveira de
ContributorsUNIVERSIDADE ESTADUAL DE CAMPINAS, Schiozer, Denis José, 1963-, Bordalo, Sérgio Nascimento, 1956-, Dumans, Carlos Fernando Fortenelle, Trevisan, Osvair Vidal
Publisher[s.n.], Universidade Estadual de Campinas. Faculdade de Engenharia Mecânica, Programa de Pós-Graduação em Engenharia de Petróleo
Source SetsIBICT Brazilian ETDs
LanguagePortuguese
Detected LanguagePortuguese
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis
Format102f. : il., application/pdf
Sourcereponame:Repositório Institucional da Unicamp, instname:Universidade Estadual de Campinas, instacron:UNICAMP
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0145 seconds