Return to search

Výroba kotevního prvku / Manufacturing of wall clamp

The design which was work out in college plan M2I-K is setting up a production technology for an wall clamp from a steel plate 11 321.1. Based on the literature search it was chosen optimal technology of cutting and forming. Structural and technological calculations were implemented for these methods and the composite machine tool was projected. The eccentric bending press CDCH 3000P was chosen because of its working power. Working parts of the tool are made from steel 19 436.3. Price of the component is 36 Czech crowns which is result

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:229676
Date January 2011
CreatorsIsakidis, Petr
ContributorsLidmila, Zdeněk, Podaný, Kamil
PublisherVysoké učení technické v Brně. Fakulta strojního inženýrství
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0017 seconds