Return to search

Předpjatý pás přes hluboké údolí / Stress ribbon bridge across the deep valley

The topic of this thesis is a design of stress ribbon bridge across the deep valley. The construction of the footbridge contains stress ribbon bridge with external cables and final prestressing tendons. The bridge deck is in a parabolic arc and the suspension cables are in two bend down parabolic arcs. The construction is reproduced for evaluation of longitudinal direction in the Ansys 14.0 programme and for transversal direction in the Scia Engineer 15.1 programme. The model was solved in several phases, nonlinerally. The pier was reproduced in the Scia Engineer 15.1 programme for local effect of action. The construction was evaluated for dynamic action. The construction is assessed according to the actual EN standards.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:265226
Date January 2017
CreatorsTomisová, Gabriela
ContributorsBrtáň, Stanislav, Nečas, Radim
PublisherVysoké učení technické v Brně. Fakulta stavební
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0017 seconds