M.Ing. (Engineering Management) / This dissertation provides a study of productivity improvement to project Scope Change Management (SCM) processes in the Engineer-Procure-Construct (EPC) project environment using lean techniques. The motivation for carrying out this study was, to optimise the typical scope change management systems to improve efficiency and most importantly the process productivity. It aims to present a conceptual approach to reduce bottom line impact brought about by the management of scope change events. A brief literature study of the industry, scope change management systems and the EPC project environment is provided together with an overview on the Value Streams (VS) mapping methodology for lean systems improvement. The improvement study sets out to establish the current status quo of EPC project change management systems through survey and literature study. The assessment establishes a necessary baseline and identifies various aspects within the scope change management system that need to be improved. An improvement effort is made on the current state map using lean principles and Design Structure Matrix (DSM) techniques to establish process efficiency and hence productivity increase. The study presents the results of the lean improvement; this is presented in the form of a process future state map proposal for further lean intervention and implementation. The study concludes with a brief discussion of an implementation plan. Collectively, the study aims to provide tools for VS based improvement and consequently meet the objective of a solution for bottom line productivity improvement in EPC Scope Change Management systems.
Identifer | oai:union.ndltd.org:netd.ac.za/oai:union.ndltd.org:uj/uj:12336 |
Date | 17 September 2014 |
Creators | Cleaver, Jayson |
Source Sets | South African National ETD Portal |
Detected Language | English |
Type | Thesis |
Rights | University of Johannesburg |
Page generated in 0.0019 seconds