Effective production scheduling is essential for improved performance. Scheduling strategies for various shop configurations and performance criteria have been widely studied. Scheduling in parallel machines (PM) is one among the many scheduling problems that has received considerable attention in the literature. An even more complex scheduling problem arises when there are several PM families and jobs are capable of being processed in more than one such family. This research addresses such a situation, which is defined as an Associative Parallel Machine scheduling (APMS) problem. This research presents the SAPT-II algorithm that solves a highly constrained APMS problem with the objective to minimize average flow time. A case example from a make-to-order industrial product manufacturer is used to illustrate the complexity of the problem and evaluate the effectiveness of the scheduling algorithm.
Identifer | oai:union.ndltd.org:uky.edu/oai:uknowledge.uky.edu:gradschool_theses-1616 |
Date | 01 January 2009 |
Creators | Shuaib, Mohannad Abdelrahman |
Publisher | UKnowledge |
Source Sets | University of Kentucky |
Detected Language | English |
Type | text |
Format | application/pdf |
Source | University of Kentucky Master's Theses |
Page generated in 0.0025 seconds