Return to search

Výpočet ustáleného chodu sítě 110 kV / Calculation of the network steady state on the voltage level 110 kV

This thesis deals with load flow calculation of electrical network 110 kV before and after the connection to the 70MW gas supply and the 58MW steam and gas supply. This grid can be powered from two 400/110kV substations, namely Sokolnice and Otrokovice. The load flow calculation is realized for the power supply either from Otrokovice or Sokolnice. Furthermore, the calculation of the uni-phase and three phase short circuits in the substations of 110kV network is realized in this thesis. The result of the thesis is the assessment of the voltage ratio in the network, current load of the power line and short circuit resistance of the substations.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:220676
Date January 2014
CreatorsMacháč, Petr
ContributorsVaculík, Petr, Mastný, Petr
PublisherVysoké učení technické v Brně. Fakulta elektrotechniky a komunikačních technologií
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0017 seconds