Return to search

Centrum integrovaného záchranného systému / Centre of Integrated Safety System

It is a new Centre of the Integrated Rescue System to p No. 375/2 in the cadastral Sand 720755th The project documentation is conducted only for the fire station. that consists of three dilated from buildings. Building for day stay is three-storey, two-storey garage with workshops and drying storey tower. Brick construction system based on the footings. Horizontal structure prestressed panels are at SPIROLL. The roof is flat, single-layer and desk hunter cased. Concrete floors are connected by a staircase in the building for day stay and welded steel in the drying tower.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:226342
Date January 2013
CreatorsSoukup, Ondřej
ContributorsSláma, Ing Ludvík, Mohelníková, Jitka
PublisherVysoké učení technické v Brně. Fakulta stavební
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0029 seconds