Return to search

South African public private partnership (PPP) projects

The purpose of this thesis is to disseminate research work done towards a higher degree and report on the findings of the research that was conducted relative to South African Public Private Partnership (PPP) projects. The research investigated perceptions of PPP actors on the performance of operational PPP projects. The aim of the research was to fulfil the requirements for the award of the degree of philosophiae doctor in construction management; contribute to the PPP body of knowledge; contribute further understanding of the performance of PPP projects in South Africa; and develop a systemic model for a sustainable PPP system within the country and beyond. All the aforementioned have been achieved, despite the research limitations as indicated in Chapter 1. A case study approach was adopted to examine various performance aspects of operational South African PPP projects. The research was a multi-case study design. Each individual case study consisted of a ‘whole’ study, in which facts were gathered from the selected PPP projects and conclusions drawn on those facts. A web-based questionnaire was used to capture the experiences and perceptions of various actors involved directly, or indirectly in selected PPP projects. The sample stratum consisted of all operational PPP projects registered in accordance with Treasury Regulations as of December 2005 and other projects that reached financial closure before the Public Finance Management Act of 1999 became effective. PPPs involve highly complex procurement processes, are relatively new in South Africa and to date have attracted limited investigation to refine our understanding of the operational performance of PPP projects. This is notable, as significant financial and other resources are involved, and the perception exists that service delivery in most parts of the country is poor. Key empirical evidence from the research indicates that South Africa has developed a robust policy and regulatory framework for PPPs; has an inadequate level of PPP awareness and training; and lacks the project management capacity to facilitate deal flow. It is suggested that further research be conducted on a yearly basis, preferably every six months, so that trends can be established concerning various aspects of other operational PPPs. Further, it is recommended that the PPP Unit commission sector-specific studies that will conduct further research, to compare research across PPP and non-PPP contracts. The choice to conduct a multi-case study required extensive resources and time beyond the means available to the researcher. Further, the sensitive nature of PPP projects made it difficult to obtain required data at the first attempt. However, the researcher made several follow up calls and reminders before eventually obtaining the required data from the respondents. A systemic PPP model has been developed for PPP implementation and management. This model was tested for appropriateness by conducting a further survey on PPP participants attending an international conference on 'Financing of Infrastructure Development in Africa through Public Private Partnerships’ staged in August 2007, in the St. George Hotel, Johannesburg, South Africa. The findings from this research make an invaluable and original contribution to the PPP body of knowledge, provide insight for further research in this important field, refine the understanding of operational PPP projects, and provide direction for policy and decision makers in the public and private sectors, within South Africa and beyond.

Identiferoai:union.ndltd.org:netd.ac.za/oai:union.ndltd.org:nmmu/vital:9696
Date January 2008
CreatorsNyagwachi, Josiah Nyangaresi
PublisherNelson Mandela Metropolitan University, Faculty of Engineering, the Built Environment and Information Technology
Source SetsSouth African National ETD Portal
LanguageEnglish
Detected LanguageEnglish
TypeThesis, Doctoral, PhD
Formatxxvi, 189 leaves ; 30 cm, pdf
RightsNelson Mandela Metropolitan University

Page generated in 0.0018 seconds